Buy in on QA/QC requirements agreed to with AHJs prior to POD manufacturing.
• Clear standards are agreed to and used as the base for manufacturing (with AHJ and Client input)
• Members of AHJ are present during prototype evaluation
• AHJs are invited to visit manufacturing facility at their convenience
• We have relationships with national third party inspection agencies that can perform the required inspections if allowed by the AHJs.
• In states and jurisdictions where it exists, we seek manufacturing certification which typically expedites and simplifies the inspection process (e.g.Texas IHB certification)
• Each POD is evaluated by the QA/QC Team at each stage in production.
• Quality issues are identified and corrected as they occur.
• A 5-Why analysis is performed to ensure measures are implemented to ensure defects do not occur again.
• Neopod follows a strict project specific QA/QC procedures and specification manual (available upon request) which is constantly evolving during the construction process.
• Several “hard” QC checks through the line where PODs are not allowed to advance until approved by one of our senior QC team members.